Recently a 300-foot crane collapsed, toppling onto a building under construction in Long Island City, Queens, trapping three workers under debris and injuring seven. The crane smashed onto plywood and concrete, and wreckage could be seen stretching for hundreds of feet. Buildings Department Commissioner Robert Limandri said it appears the crane operator attempted to lift a load of 23,900 pounds on the crane, more than double the weight capacity for the crane.

Limandri said the operator was unable to see the load being lifted and he was apparently trying to lift the materials outside the approved loading zone. The operator's license has been suspended, according to Limandri. A stop work order for crane operations at the construction site remains in effect while the investigation continues.

How could this have been avoided? There are several factors that can contribute to a load overbearing accident.

Too often the end user provides an inaccurate load weight or only guesses at the weight.  Sometimes errors in paperwork during the planning process, or oversight of fluid materials contained within an object such as a tank renders manufacturer information inaccurate.  Manufacturer information plates on equipment often only list the “dry weight,” or weight of equipment while empty.

Crane operators and erectors must check that the crane has the correct counterweights and boom configuration for the lift, and that the Load Moment Indicator (LMI) is properly programmed.  The load moment indicator device is a secondary device meant to warn the operator of exceeding capacity and is NOT a device that should be used to verify or confirm the weight of a load.  Load weight must be determined prior to make the lift.

Partial or zero counterweight lifts may also be very dangerous when the load charts for such configurations are not properly understood, or when making a lift on poor ground conditions.

What are our OSHA B30 Duties?

The crane operator must use load charts to confirm the correct crane configuration for the load, site and lift conditions and verify net capacity with the lift director for the load and rigging weights provided.  The lift director will confirm load weights, ensure that the load is properly rigged and balanced, and prepare the site for lifting operations.

Our customer stories

Perfect Service Starts Here
  • “Professional, safe , and experienced crane operators. Some of the best I’ve had the pleasure to work with in 40 years of building power lines. On time service, and they go above and beyond to make sure they take care of the customer’s needs from cranes to hauling logistics. Really a pleasure to work with.” 

    - Jim
  • “Sims Crane Atlanta is the best in the business. I have worked with this group for the last 10 years and have always had tremendous success using them. They are highly knowledgeable, top tier equipment, professionalism, pricing, communication, etc. I would highly recommend using them with your next project!” 

    - Brandon
  • “It is always a pleasure working with Sims! Some of the best operators in the business, as well as a very in touch sales team! Highly recommend using them for any crane needs.” 

    - Dylan
  • “The efforts were led with consistent feedback, planning and precise execution day by day, making a difficult task painless and smooth. The install team was very professional, well trained and knowledgeable. They answered any questions we had and ensured a safe and swift installation, faster than anticipated. They were accommodating for last minute field decisions and provided assistance wherever needed. All of the Sims team members have proven to be true construction professionals and thus I will continue to reach out on future projects.” 

    - Landon
Additional Information