When is a Hazard Not a Hazard?

With the OSHA Crane and Derrick Standard came concepts long overdue. One in particular, the use of "Temporary-Alternative-Measures" or TAM.

Historically, OSHA sets crane requirements. When requirements are not met, the crane must be taken out of service until it is in compliance. The problem with this approach is, although the condition may be a hazard, there may be alternative means of managing the hazard. As an example, an outrigger warning label is unreadable. Could workers be warned by another method until the label is replaced? Traditionally with OSHA, the answer would be “NO.” However, the Cranes and Derrick Standard gives management personnel new tools to keep the crane working safely.

ASME standards have always recognized that all deficiencies are not alike and a qualified person must determine if a deficiency constitutes a safety hazard. Even then, work may be permitted to continue to the end of the shift. The decision to continue working is based on a hazard analysis, where qualified workers analyze the situation and determine the risk involved. If the risk is low, work proceeds. If the risk is high, work is stopped until the risk is reduced or eliminated, if possible. This allows management to make choices when it comes to jobsite safety, rather than following OSHA to the letter.

The OSHA Cranes and Derrick Standard separates devices on cranes into two groups; safety devices and operational aids. If a safety device is not working, the crane cannot operate until the hazard is corrected. Good news is, the list of safety devices is short.

Safety Devices (29 CFR 1926.1415)

1. Crane level indicator

2. Boom stops

3. Jib Stops

4. Foot pedal brake locks

5. Outrigger hydraulic check valves

6. Horn

The list of operational aids is longer and contains devices that most workers would consider safety devices. If an operational aid is not working properly, the crane can still be used if a Temporary Alternative Measure (TAM) can be found that will assure the crane is safe to use. For instance, take the anti-two-blocking device. The use of strategically placed, high-visibility paint, on hoist rope, giving the operator sufficient time to stop, would allow the crane to remain in service.

Operational Aids (29 CFR 1926.1416)

1. Boom hoist limit device

2. Luffing jib limiting device

3. Anti-two-blocking device

4. Boom angle or radius indicator

5. Jib angle indicator

6. Boom length indicator

7. Load weighing and similar devices

8. Outrigger/stabilizer position sensor/monitor

9. Hoist drum rotation indicator

About Crane Institute

For almost 30 years Crane Institute of America, Sanford, Fla., has offered training for operators, inspectors, safety managers, lift directors, and riggers and signalpersons working with mobile cranes, overhead cranes, tower cranes, aerial lift and forklifts. It is an authorized CIC written and practical exam testing site. For information, visit www.craneinstitute.com.

Our customer stories

Perfect Service Starts Here
  • “Professional, safe , and experienced crane operators. Some of the best I’ve had the pleasure to work with in 40 years of building power lines. On time service, and they go above and beyond to make sure they take care of the customer’s needs from cranes to hauling logistics. Really a pleasure to work with.” 

    - Jim
  • “Sims Crane Atlanta is the best in the business. I have worked with this group for the last 10 years and have always had tremendous success using them. They are highly knowledgeable, top tier equipment, professionalism, pricing, communication, etc. I would highly recommend using them with your next project!” 

    - Brandon
  • “It is always a pleasure working with Sims! Some of the best operators in the business, as well as a very in touch sales team! Highly recommend using them for any crane needs.” 

    - Dylan
  • “The efforts were led with consistent feedback, planning and precise execution day by day, making a difficult task painless and smooth. The install team was very professional, well trained and knowledgeable. They answered any questions we had and ensured a safe and swift installation, faster than anticipated. They were accommodating for last minute field decisions and provided assistance wherever needed. All of the Sims team members have proven to be true construction professionals and thus I will continue to reach out on future projects.” 

    - Landon
Additional Information