The Journeyman Rigger Training course at ITI produces students from every industry imaginable.  Though they may all differ quite a bit in background, their foundational knowledge about rigging should include very similar things.  These 5 "Old Rigging Sayings" should be on the lips of every Journeyman Rigger:
1.  "Always rig to the Center of Gravity":  The CG is the point about which the load’s weight is concentrated. It is the balance point of the load in all axes. To "rig to the CG" that all slings (rigging) meets at the crane hook, over the CG.  If the rigging contacts the load and is snug, when the crane lifts, the load should fly basically level. Remember, when rigging below the CG, it must be rigged with a minimum of three slings.
2.  "Never saddle a dead horse":  This statement refers to properly applying wire rope clip hardware when forming an eye.  When a rigger needs to create an eye in the end of a wire rope, and he chooses to use a clip, he turns the wire rope dead-end and applies the U-bolt to the dead-end of the rope and the clip to the "live" end.  This "saddle" on the live end, should never be placed on the dead end or "horse".  The U-bolt, as it is tightened down often will crush the wire rope, and a good rigger wants that crushing to be on the dead end.
3.  "Stay out of pinch points":  When a load is suspended in the air many factors can cause it to move one way or another (e.g. crane operator, not rigging to the CG, wind, or boom deflection).  The point is, the rigger and other personnel nearby should never be between the suspended load or any load under tension and an object that could pinch or crush you against a wall, another load, or an obstruction. 
4.  "Never stand in the bight of the line":  This is a caution to riggers when using winches and blocks.  The “bight” is generally regarded as the inside angle created at a rigging block. If the load is snagged and the winch keeps pulling, a rigger can be injured due to rigging failure, if standing inside a block angle.
5.  "Synthetic slings in your right hand, sling protection in your left":  Many riggers have been moving away from heavy alloy chain and wire rope slings to lighter synthetic web and roundslings.  The one thing a rigger needs to remember is sling protection.  Synthetic slings are great, if they are protected.  Mike Parnell, President of ITI and Vice Chairman of the ASME B30 spoke at the 2009 WSTDA (Web Sling and Tie-Down Association) Annual Conference in Seattle.  He shared seven accident investigations that he had conducted, the bulk of which were caused by unprotected synthetic slings.  So, whenever you grab synthetic slings in your right hand, grab sling protection in your left.
Concluding, use these saying often, they will never wear out.  They will actually do the opposite - prevent injury, save money, and save lives.
Industrial Training International has conducted Journeyman Rigger Training as well as Master Rigger Training for over 25 years.
Source: http://iti.com/simscrane

Our customer stories

Perfect Service Starts Here
  • “Professional, safe , and experienced crane operators. Some of the best I’ve had the pleasure to work with in 40 years of building power lines. On time service, and they go above and beyond to make sure they take care of the customer’s needs from cranes to hauling logistics. Really a pleasure to work with.” 

    - Jim
  • “Sims Crane Atlanta is the best in the business. I have worked with this group for the last 10 years and have always had tremendous success using them. They are highly knowledgeable, top tier equipment, professionalism, pricing, communication, etc. I would highly recommend using them with your next project!” 

    - Brandon
  • “It is always a pleasure working with Sims! Some of the best operators in the business, as well as a very in touch sales team! Highly recommend using them for any crane needs.” 

    - Dylan
  • “The efforts were led with consistent feedback, planning and precise execution day by day, making a difficult task painless and smooth. The install team was very professional, well trained and knowledgeable. They answered any questions we had and ensured a safe and swift installation, faster than anticipated. They were accommodating for last minute field decisions and provided assistance wherever needed. All of the Sims team members have proven to be true construction professionals and thus I will continue to reach out on future projects.” 